Power Plant:
Power Gas Energy, Sattur, kovilpatti
Grid Linked Power Plant:
Power Generation System:
- Biomass gasification based power generation of 1000 KWe using 100% Producer gas engines.
- Gasification system nominal rating – 1200 Kg/Hr.
- Gas Engines capacity 2 X 500 KWe & 1 X 240 KWe.
- All the engines are synchronized with TNEB grid.
- Plant Commissioned on 24.7.13.
Cummins India, Pune, Maharastra
Captive Power Plant for R&D Purpose:
Power Generation System:
- Biomass gasification based power generation of 25 KWe using 100% Producer gas engines.
- Gasification system nominal rating – 60 Kg/Hr.
- Gas Engines capacity – 25 KWe.
- Plant Commissioned on – Nov’2015.
Pointec Writing Instruments, Hosur
Captive Power Plant
Power Generation System:
- Biomass gasification based power generation of 325 MWe using 100% Producer gas engines.
- Gasification system of nominal rating – 400 Kg/Hr.
- Gas Engines capacity – 1 X 240 KWe & 1 X 125KWe.
- All the gas engines are synchronized for captive usage.
- Plant Commissioned on – Jun’2009.
Beach Minerals Company, Tirunelveli
Captive Power Plant for an EOU unit in Tamilnadu
Power Generation System:
- Power generation of 600,000 to 800,000 kWh per month.
- Biomass gasification based power generation of 1.5 MWe using 100% producer gas engines.
- Gasification system of nominal rating – 2 x 850 kg/hr.
- Gas Engines capacity – 7 X 240 KWe.
- All the Gas engines are synchronized for captive usage.
Sri Sastha Energy, Chennai
Grid Linked Power Plant:
Power Generation System:
- Biomass gasification based power generation of 750 KWe using 100% producer gas engines.
- Gasification system nominal rating – 850 Kg/Hr.
- Gas Engines capacity 3 X 240 KWe.
- All the engines are synchronized with TNEB grid.
- Commissioned on Feb’2010.
Beach Minerals Company, Tirunelveli
Captive Power Plant for an EOU unit in Tamilnadu:
Power Generation System:
- Power generation of 600,000 to 800,000 kWh per month.
- Biomass gasification based power generation of 750 KWe using 100% Producer gas engines.
- Gasification system nominal rating – 1 x 850 Kg/hr.
- Gas Engines capacity 7 X 240 KWe.
- All the gas engines are synchronized for captive usage.
- Commissioned on Jan’2009.
Power and Thermal Application:
Godrej & Boyce Mfg Co, Utharakand
Plant Capacity : 500 Kg/Hr Gasification system.
Fuel Replacement : 100 ltrs Diesel / Hr & 200KW power generation for Captive.
Plant Commissioned On : Feb’2010.
Application : Powder Coating and Captive power generation.
Thermal Plants:
ITC Food Division, Vellakoil
Plant Capacity : 600 Kg/Hr Gasification system.
Fuel Replacement : 150 ltrs FO / hr.
Plant Commissioned On : August’2010.
Application : Biscuit Baking.
ITC Food Division, Thirubuvanai Pondicherry
Plant Capacity : 600 Kg/Hr Gasification system.
Fuel Replacement : 150 ltrs/hr FO.
Plant Commissioned On : Oct’13.
Application : Biscuit Baking.
ITC Food Division, Vellakoil
Plant Capacity : 600 Kg/Hr Gasification system.
Fuel Replacement : 150 ltrs/hr FO.
Plant Commissioned On : Nov’2010.
Application : Biscuit Baking.
Britannia Industries, TC Palam, Tamilnadu
Plant Capacity : 2 X 500 Kg/Hr Gasification system.
Fuel Replacement : 250 ltrs/hr Diesel / FO.
Plant Commissioned On : Feb’2010.
Application : Biscuit baking wises and termic fluid heater
Godrej & Boyce Mfg Co, Shirwal, Maharashtra
Plant Capacity : 400 Kg/Hr Gasification system.
Fuel Replacement : 100 ltrs/hr Diesel.
Plant Commissioned On : Feb’2010.
Application : Powder Coating.
Godrej & Boyce Mfg Co, Mohali, Punjab
Capacity : 400 Kg/Hr Gasification system.
Fuel Replacement : 100 Kg LPG /HR.
Plant Commissioned On : April’2010.
Application : Powder Coating.
Jeyyam Foods, Thevitipati Salem
Plant Capacity : 300 Kg and 450 kg per hour.
Fuel Replacement : 200 ltrs/hr FO.
Plant Commissioned On : June’2015.
Application : Dal Fry.
Balamurugan Chemicals, Keelathattaparai, Tutucorin
Plant Capacity : 2 x 1600 Kg/Hr Gasification system.
Fuel Replacement : 800 ltrs/hr FO
Plant Commissioned On : Feb’2012
Application : For Titanium Di Oxide Calcination.
Beach Minerals Company, Tirunelveli, Tamil Nadu
Plant Capacity : 400 Kg/ Hr.
Fuel Replacement : 80-100 ltrs/hr Diesel.
Plant Commissioned On : Jan’2008.
Application : Mineral drying.
Kandasamy Metal Rolling, Palakad, Kerala
Fuel Replacement : 25 ltrs/hr FO.
Plant Commissioned On : April’2007.
Application : Aluminum Melting.
KCP Packaging, Karur
Gasifier Capacity : 35kg/hr.
Application : Cooking.
Amrita Institute of Medical Science, Cochin, Kerala
Plant Capacity : 250 Kg/Hr Gasification system.
Fuel Replacement : 200Kg LPG/day & 400ltrs Diesel /Day.
Plant Commissioned On : Feb’2009.
Application : Cooking.
Sonali Extrusions, Coimbatore, Tamil Nadu
Plant Capacity : 600 Kg/Hr Gasification system.
Fuel Replacement : 150 ltrs/hr FO.
Plant Commissioned On : March’2011.
Application : Aluminium Melting and Extrusion.
Olivellam, Srilanka
Gasifier Capacity : 150kg/hr.
Application : Tea Drying.
Fuel Replacement : 30ltrs/hr.
KMC Aluminum Industries, Coimbatore, Tamil Nadu
Plant Capacity : 300 Kg/Hr Gasification system.
Fuel Replacement : 100% FO replacement
Plant Commissioned On : Jan’2012.
Application : Aluminium Melting – Vessel Mfg.
Notes
Successful Ventures:
- One single gasifier system being utilised for 3 fosil fuel like LPG, diesel & FO.
- Thermic fluid boiler was operated in 100% PG.
- Fluidised bed dryer was operated in 100% PG.
- Producer gas to use for cooking with full safety aspects.
- Running very successfully with power synchronization mode for captive usage as well as gird linking project.
- Ability to provide training for operation & maintenance priors. To commissioning of the new plant.
- Completion of thermal project in 4 months & power projects in 6 months.
- Experience in executing thermal Gasifier plants for different applications like Biscuit baking, Cooking, Heating and Melting applications very successfully.
Benefits:
- Conversion of coconut shell into activated corban as a bi product.
- Conversion of wood into corban as a by product.
Cost Benefits:
Cost of Power / Unit:
1.1 kg of Biomass = 1 KWH
Cost of 1 KWH of power generated is about Rs. 5.50
(Considering Rs.4,000/- MT of biomass and additional operation & maintenance cost).
Cost of Fuel Replacement / Liter of Fossil Fuel:
4 Kg of biomass = 1Kg of LPG or any other fossil fuel.
Cost of replacing 1 Kg if LPG or any other fossil fuel is about Rs.18.00 (Considering Rs 4,000/- MT of biomass and additional operation & maintenance cost).
Minimum Savings of 50% can be achieved for any fossil fuel.